Hoechstleistungsrechner
SuperMUC-ng Phase 2 (GPU): A maintenance is scheduled from 02.06.2025 to 03.06.2025. Job operation will be suspended and access to the system might be limited.
June 4, 08:00: System is back in operation.
Zuletzt aktualisiert: Mo., 02.06.2025 08:00