Maintenance SuperMUC-NG Phase 1

Mo., 06.10.2025 08:00 – voraussichtlich bis Do., 09.10.2025 09:00

Hoechstleistungsrechner


09.10.2025: Maintenance is finished. The system is back in operation. Queues and login nodes are open.

-——————————————————————–

In calendar week 41 we have a scheduled maintenance of the SuperMUC-NG Phase 1 cooling system. All queues will be halted before. Running jobs will not be affected. On Monday October 6 login will be disabled and all nodes will be drained. Operation will restart latest at the end of the week. Please check on updates of this status report. Access to the WORK and SCRATCH file systems is still possible via the Phase 2 login nodes (pvc.supermuc.lrz.de).

Zuletzt aktualisiert: Do., 09.10.2025 08:58